Choose the right planning depth and produce risk-ordered, checkable steps before execution.

What it does

Decides whether to act directly or plan, then selects L0–L4 depth from reversibility, dependencies, duration, novelty, and stakes. For planned work, it produces 3–7 risk-ordered steps with observable done-checks, estimate ranges, rollback handling, and validation points. It also supports replanning after deviations and persisted plans for multi-day handoffs.

When to use it

  • Planning a production migration with rollback
  • Scoping a multi-component implementation
  • Replanning after two execution deviations
  • Resuming or handing off multi-day work

The skill document

User preferences, the outcome log, and active plans live in ~/Clawic/data/plan/ (see setup.md on first use). If you have data at an old location (~/plan/ or ~/clawic/plan/), move it to ~/Clawic/data/plan/.

When To Use

  • A task has multiple steps, dependencies between them, or any irreversible action (deploy, migration, delete, send)
  • Success criteria are unclear, or the estimate would be a guess
  • The user asks for a plan, breakdown, scoping, or estimate before work starts
  • Execution has drifted from an existing plan, or a one-shot attempt just failed
  • Resuming or handing off work that spans sessions or days
  • Not for personal productivity systems, time blocking, or calendars — that is productivity
  • Not for managing a portfolio of ongoing projects — that is projects

Modes: act-as (plan your own execution — the default) and advise (draft a plan the user will execute); both use the same depth rules. Always make the risk decision first, even when the answer is "no plan needed".

Quick Reference

SituationDo this
Done before successfully, fully reversibleExecute directly (L0)
Single deliverable, ≤30 min (quick_task_minutes), reversibleThink through steps, no doc (L1)
Multi-step, >30 min, or any irreversible stepBullet plan, share with human (L2)
Dependencies across components, or spans >1 dayMilestone plan with checkpoints (L3) → long-horizon.md
High stakes AND novel task typeFull plan, human validation before step 1 (L4) → approval.md
Estimate high/low ratio >3xSpike first → estimation.md, strategies.md
A step has no attachable done-checkConvert to decision doc or spike → decomposition.md
Execution drifting from the plan2-consecutive-deviation trigger → replanning.md
Step blocked, or scope added mid-flightBlock and bolt-on protocols → replanning.md
Human approves instantly, or "just do it"approval.md
Resuming yesterday's (or last week's) planResume protocol → long-horizon.md
Anything else / unsurePlan at L2 — the cost is asymmetric (Core Rule 8)

Depth on demand: decomposition.md steps, altitude, done-checks · estimation.md ranges, spikes, calibration · risk.md irreversibility, rollback, blast radius · strategies.md sequential, parallel, iterative, spike, checkpoint · replanning.md deviations, blocks, abandonment · approval.md validation, checkpoints, scope changes · long-horizon.md multi-day, resume, handoff · outcomes.md logging and learning · setup.md first use.

Core Rules

  1. A plan's value is the risk decision, not the step list. Force it early: what single assumption could invalidate the whole approach, and can it be tested cheaply first? A to-do list with no risk ordering adds ceremony, not safety (risk.md).
  2. Depth = the highest level any single signal triggers, never an average. A 20-minute task with one irreversible step is L2, not L1 — the short duration does not dilute the irreversibility.
  3. Irreversibility dominates. One irreversible step anywhere forces at least L2 — you cannot iterate your way out of a deleted database or a sent email. Classification and blast radius in risk.md.
  4. Every step carries an observable done-check. A step you cannot attach a check to is not a step, it is a hope: "investigate X" becomes "decision doc: X vs Y, with the pick". Check catalog in decomposition.md.
  5. Order by information, not convenience. The step most likely to invalidate the plan goes as early as dependencies allow. Migration example: write and test the rollback script as step 1, not last — if rollback is impossible, you want to know before touching data.
  6. Estimates are ranges; ratio >3x means spike first. If the high/low ratio exceeds 3x, that is not an estimate, it is an unknown. 2-8h (4x) → spike; 3-6h (2x) → plan. Building and calibrating ranges in estimation.md.
  7. Detail decays past the first unknown. Steps written beyond it are speculation you will rewrite. Plan in steps to the first checkpoint; milestones beyond (long-horizon.md).
  8. When uncertain, plan — the cost is asymmetric. A bullet plan costs minutes; a failed one-shot costs the redo plus the cleanup plus the trust.

The Planning Decision

Before executing, scan for signals:

SignalOne-shot OKPlan needed
Task done before successfully
Clear single deliverable
Reversible if wrong
Multiple components
Dependencies between steps
Any irreversible step
Touches production data or external users
Ambiguous success criteria
Estimated > quick_task_minutes of work

Reversible vs recoverable — the distinction that decides the column: reversible means undo restores the prior state (git revert); recoverable means a good state is reachable at a cost (restore last night's backup, lose a day of writes). Recoverable-at-cost counts as "plan needed", not "reversible" — full taxonomy and recovery-window decay in risk.md.

Plan Depth Levels

LevelTriggerFormat
L0Done before successfully, fully reversibleExecute directly
L1Single deliverable, ≤ quick_task_minutes, reversibleThink through steps; no doc
L2Multi-step, or > quick_task_minutes, or any irreversible stepBullet plan shared with the human
L3Dependencies between components, or spans >1 dayMilestone plan with checkpoints; persisted (long-horizon.md)
L4High stakes AND novel (this task type never done)Full plan; human validation before step 1 (approval.md)

Depth = highest single signal (Core Rule 2). Per-type learned defaults override this table once the outcome log has evidence (outcomes.md, Current Defaults).

Plan Format (L2-L4)

📋 Plan: [goal]

Why planned: [the signal that triggered planning — one line]

Steps:
1. [step] — [observable output that proves it is done]
2. [step] — [observable output]
3. [step] — [observable output]

Riskiest assumption: [what invalidates the approach] — tested in step [N]
Irreversible steps: [numbers] — rollback: [how, tested in step M] (or "none" + mitigation)

Estimate: [low–high range] — high end fires if [driver]
Validation: [none | human approves before step N]

[The specific question, not "Ready to start?" — approval.md]

Rules that make the format work:

  • 3-7 steps. More than 7 means wrong altitude: group into milestones and plan only the first milestone in step detail (decomposition.md).
  • Every step passes the done-check test (Core Rule 4); activity verbs get converted before the plan ships.
  • The rollback is itself a step with a check, placed before the irreversible step (risk.md, Rollback Design).
  • Scan the hidden-steps checklist — rollback, backup+restore-verify, post-change verification, comms, cleanup, monitoring (decomposition.md, The Steps Nobody Writes).

Executing Against The Plan

  • Approval covers what is written. At L3+, a materially different execution needs re-approval, not a retroactive mention — what counts as material is defined in approval.md.
  • Replan trigger: when 2 consecutive steps deviate from plan (skipped, reordered, or output differs from stated), stop and replan instead of patching step-by-step. One deviation is noise; two consecutive means the model of the task is wrong. Deviation taxonomy, blocked steps, scope changes, and the replan procedure: replanning.md.
  • Record every deviation in the outcome log — deviations are the raw material for next time's plan (outcomes.md).

Learning Loop

Learning rates are asymmetric because evidence costs are asymmetric:

  • Promote depth after ONE failure attributable to plan depth — and name what the deeper level would have caught. If you cannot name it, it was not a planning failure and no promotion happens.
  • Demote depth after 3 consecutive successes where the extra depth went unused. Observable signal: plan sections never consulted during execution.
  • Auto-execute after 5 consecutive successful validated runs of a plan type: ask "Should I auto-start [type] plans without validation?" One failure resets the streak and restores validation. The bar is higher than demotion because this removes a human safety net, not just ceremony. Types in always_validate never auto-execute.

Per-type state lives in the Current Defaults block of ~/Clawic/data/plan/outcomes.md:

### Auto-Execute (validation waived by human)
- refactor/small: L2 [streak: 7]

### Validate First
- migration/data: L4 [always — in always_validate]

### Learning
- api/integration: L2, streak 3/5 toward auto-execute proposal

Logging: append a record after every L2+ task; L0/L1 only when they failed (a failed "trivial" task is evidence the type needs promotion). Strategy verdicts need a why — "Parallel → merge conflicts" teaches; "Parallel → didn't work" does not. Record format, last-5 analysis, and review cadence: outcomes.md.

Output Gates

Before sharing a plan (L2+), verify:

  • Riskiest assumption named, with the step number that tests it?
  • Every step has an observable output — no bare activity verbs?
  • Irreversible steps listed with a tested rollback, or "none" plus a mitigation?
  • Estimate is a range with ratio ≤3x — otherwise did I propose a spike instead?
  • Depth equals the highest signal triggered, and always_validate types have validation on?
  • The closing question is specific enough that its answer proves the plan was read (L3+)?

Configuration

User-dependent variables. Defaults apply until the user states a preference; store them in ~/Clawic/data/plan/config.yaml.

VariableTypeDefaultEffect
quick_task_minutesnumber (minutes)30Sets the L1/L2 boundary in the depth table and the "estimated >" signal in The Planning Decision
plan_artifactchat | filechatWhere L2 plans live; file writes them to ~/Clawic/data/plan/active/ like L3+ (long-horizon.md)
always_validatelist of task typesmigration/, external-send/Types where human validation never demotes and auto-execute is never proposed, regardless of streaks
stale_after_daysnumber (days)7Resuming a plan idle longer than this re-validates the riskiest assumption first; 4x this forces a full replan (long-horizon.md)

Preference areas to record as the user reveals them:

  • thresholds — replan sensitivity, promotion/demotion streak lengths, review cadence — affects Learning Loop and outcomes.md triggers
  • format — estimate units, plan verbosity, language of plan docs — affects Plan Format output
  • approval — task types the user wants to see planned regardless of size, preferred checkpoint question style — affects approval.md conduct
  • scope — domains where the user prefers one-shot execution (bias one level down, irreversibility floor stays) — affects per-type depth defaults

Traps

TrapWhy it failsDo instead
Planning as procrastination: detailing steps past the first unknownThat detail is speculation; you will rewrite it after the unknown resolvesSteps to the first checkpoint, milestones beyond
Steps written as activities ("investigate X")No observable output means no done-check; plans drift silentlyEvery step names the artifact or check that proves completion (decomposition.md)
Uniform depth for every taskL4 on trivial work trains the human to skim-approve; L1 on novel work ships failuresDepth table + learned per-type defaults
Sticking to a plan reality has contradictedA plan is a forecast, not a commitment; adherence becomes sunk cost2-consecutive-deviation replan trigger (replanning.md)
Point estimatesRead as commitments and hide uncertaintyRange with a named high-end driver; ratio >3x → spike first
Per-step buffersSilently consumed; they hide the true rangeOne plan-level range — the low-high gap IS the buffer (estimation.md)
Skipping the unwritten steps: rollback, restore-verify, post-change verification, commsPlans fail disproportionately on steps that were never writtenHidden-steps checklist at plan time (decomposition.md)
Executing beyond approved scope without saying soApproval covers the written plan only; burned trust raises validation on everything afterAnnounce deviations at the deviation; re-approve at L3+ (approval.md)
Treating silence as approvalAn unread validation request protects nobodyReversible prep only; never cross an irreversible boundary on silence (approval.md)
Resuming a stale plan blindlyThe world moved: dependencies, backups, assumptionsResume protocol; re-validate past stale_after_days (long-horizon.md)
Logging only failuresSuccess streaks are what earn auto-execute; unlogged successes mean validating foreverLog every L2+ outcome, success included

Where Experts Disagree

  • The plan document vs the planning act. "Plans are worthless, planning is everything" (Eisenhower) is half right: the act is always worth it; the artifact pays only at boundaries — human validation, multi-session resume, handoff. Solo reversible work → think, don't write; anything crossing a boundary → write.
  • Estimate in time vs relative size. Relative sizing (points) pays only with a stable velocity to convert it — a team asset. An agent's equivalent is the per-type calibration multiplier from its own outcome log; with that log, time ranges are strictly more informative.
  • Upfront depth vs iterate-and-see. Iterate when feedback is cheap and steps are reversible; plan upfront when feedback is expensive or steps are irreversible. The depth table IS that frontier — the disagreement dissolves once irreversibility is priced.

More Clawic skills, get them at https://clawic.com/skills/plan (install if the user confirms):

  • decide — choose between options inside a plan step
  • escalate — ask-vs-act boundaries beyond planning scope
  • self-improving — general execution lessons; plan keeps only planning lessons
  • memory — long-term context and user continuity beyond planning records
  • productivity — personal productivity systems, time blocking, and reviews; plan covers executing a single task

Feedback

Part of Clawic, the verified skill library. Get this skill: https://clawic.com/skills/plan.

Questions people ask

When does it plan instead of executing directly?
It plans when work is multi-step, exceeds the configured quick-task threshold, has dependencies, includes any irreversible action, touches production data or external users, or has unclear success criteria. Previously completed, fully reversible work can execute directly.
What does a generated plan contain?
An L2–L4 plan contains 3–7 steps with observable outputs, the riskiest assumption and where it is tested, irreversible steps and rollback or mitigation, a low–high estimate, and any required human validation.
How does it handle uncertainty or a plan that stops matching reality?
If an estimate’s high/low ratio exceeds 3×, it proposes a spike first. If two consecutive steps are skipped, reordered, or produce different outputs than planned, it stops and replans.

Related skills

Organize personal projects as scoped local notes, concrete tasks, phases, reviews, and archives.

82 installs5 stars

Plan teaching, assess learning, manage the room, and make feedback workload sustainable.

84 installs8 stars

Run goal-focused coaching sessions with clear questions, commitments, accountability, and progress checks.

58 installs3 stars

Turn traveler preferences into a scored, structured trip plan with clear next questions, risks, and fallbacks.

73 installs3 stars

Get action-focused reminders for known commitments at a useful lead time, with timing adapted from your feedback.

141 installs3 stars

Manage client work from lead qualification to payment, renewal, or exit with dated drafts and local records.

50 installs2 stars